👉 Level of Development/Detail (LOD) represents how the 3D geometry of an element can achieve different levels of refinement, as per the requirement of the project at various stages.

planBIM provides different settings to ensure the Scope of work of the project through LOD, which can be selected via the required combination as per project standards and location.

LOD settings can be switched between AIA/US standards, UK standards and BIM Forum standards as per project requirements. Thus, LODs could be assigned as 1,2,3,4,5 or 100,200,300,400,500 or even as LOD350 adhering to project standards.